600+ Major Achievements

Transformative initiatives delivered by Governor Abba Kabir Yusuf's administration across all sectors of development

301
Completed
Finished projects
275
Ongoing
In progress
4
Determined
Planned projects
600+
Total
All achievements
# description remarks
1
CLEARED OVER N21 BILLION IN PENSION LIABILITIES OUT OF A TOTAL DEBT OF N48.6 BILLION INHERITED FROM THE PREVIOUS ADMINISTRATION IN THE STATE
COMPLETED
2
SOLARISATION OF KANO METROPOLITANT ROADS
ONGOING
3
INSTALLATION OF TRAFFIC LIGHTS ON KANO METROPOLITANT ROADS
ONGOING
4
SETTLEMENT OF N2.5 BILLION NAIRA OUSTANDING FEES OF 84 KANO INDIGENES STUDYING MEDICAL AND ALLIED SCIENCES AT NEAR EAST UNIVERSITY IN CYPRUS
COMPLETED
5
PURCHASE OF 500UNITS OF ELECTRIC TRANSOFRMERS TO BE DISTRIBUTED ACROSS THE 44 LGAs
ONGOING
6
DISTRIBUTION OF 10,000 FREE JAMB FORMS TO SECONDARY STUDENTS ACROSS THE STATE
COMPLETED
7
PAYMENT OF OVER 3 BILLION NAIRA FOR 141,175 SECONDARY SCHOOL STUDENTS TO SIT FOR NECO, NABTEB AND NBAIS, IN THE STATE
COMPLETED
8
APPROVING A TOTAL OF N15.6 BILLION FOR THE SETTLEMENT OF OUTSTANDING SEVERANCE GRATUITIES, ACCOMMODATION, ALLOWANCES AND LEAVE/RECESS ALLOWANCES OWED TO OVER 3,000 FORMER COUNCILORS FROM THE 44 LG COUNCILS
COMPLETED
9
CONSTRUCTION FO 5KM DUAL CARRIAGE WAY ROAD IN MAKODA LGA, KANO
ONGOING
10
CONSTRUCTION OF 5KM DUAL CARRIAGE WAY ROAD IN ROGO LGA, KANO
ONGOING
11
CONSTRUCTION OF 5KM DUAL CARRIAGE WAY ROAD IN SUMAILA LGA, KANO
ONGOING
12
COSNTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN MINJIBIR LGA
ONGOING
13
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN AJINGI LGA
DETERMINED
14
COSNTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN BAGWAI LGA, KANO
ONGOING
15
CONSTRUCITON OF 5KM DUAL CARRIAGEWAY ROAD IN BUNKURE LGA
DETERMINED
16
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN FAGGE LGA
ONGOING
17
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN KIRU LGA, KANO
ONGOING
18
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN KUMBOTSO LGA, KANO
ONGOING
19
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN SHANONO LGA, KANO
ONGOING
20
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY RAOD IN RANO LGA
ONGOING
21
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN TAKAI LGA
ONGOING
22
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN DOGUWA LGA, KANO
ONGOING
23
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN GABASAWA LGA, KANO
ONGOING
24
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN KABO LGA, KANO
ONGOING
25
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN BEBEJI LGA, KANO
DETERMINED
26
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN UNGOGO LGA, KANO
ONGOING
27
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN WARAWA LGA, KANO
ONGOING
28
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN KURA LGA, KANO
DETERMINED
29
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN GHARI, KUNCHI LGA, KANO
ONGOING
30
COMPLETION OF 5KM DUALL CARRIAGEWAY ROAD IN GARKO LGA, KANO
ONGOING
31
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN WUDIL LGA, KANO
ONGOING
32
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN KIBIYA LGA, KANO
ONGOING
33
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN GEZAWA LGA, KANO
COMPLETED
34
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN ALBASU LGA, KANO
COMPLETED
35
COMPLETION OF 5KM DUAL CARRIAGEWAY ROAD IN GWAZO LGA, KANO
COMPLETED
36
CONSTRUCTION OF 5KM DUAL CARRIAGEWAY ROAD IN DAWAKIN KUDU LGA, KANO
COMPLETED
37
COMPLETION OF TOFA 5KM ROAD, TOFA LGA, KANO
COMPLETED
38
INSTALLATION OF SOLAR STREETLIGHT AND MAINTENANCE OF 5KM IN D/TOFA LGA, KANO
COMPLETED
39
REPAIRS/MAINTENANCE OF STREEL PEDESTRIAN BRIDGES AT BUK OLD CAMPUS, SA'ADATU RIMI AND AMINU KANO COLLEGE OF ISLAMIC STUDIES KANO
COMPLETED
40
COSNTRUCTION OF MULTI-CELL BOX CULVERT AT RAFIN YABAWA
COMPLETED
41
REPAIR OF FAILED SECTION AT RIVER YALAWAI CULVERT ALONG BICH- GARZO ROAD
ONGOING
42
MAINTENANCE OF RABIU MUSA KWANKWASO/OBASANJO FLYOVER BRIDGES
COMPLETED
43
CONSTRUCTION OF ROAD FROM U/UKU 'YAN'AWAKI-LIMAWA JUNCTION AT TARAUNI LGA
ONGOING
44
CONSTRUCTION OF DRAINAGE & SLABS AT LOKON FAMFO-DAN AGUNDI-INDBW QUARTERS, KANO MUNICIPAL LGA, KANO
ONGOING
45
COSNTRUCTION OF TAL'UDU INTERCHANGE (CLOVER LEAF FLYOVER) IN GWALE LGA, KANO
ONGOING
46
CONSTRUCTION OF DAN'AGUNDI INTERCHANGE (FLYOVER & UNDERPASS)
ONGOING
47
REHABILITATION OF BAYERO SOIL ROAD PROV. OF OFF-RAMP LINKING ZOO ROAD TO ADO BAYERO MALL
COMPLETED
48
CONTRUCTION OF EROSION MENACE AT GARANGA BRIDGE IN BUNKURE LGA, KANO
ONGOING
49
REPAIRS/REPLACEMENT AND INSTALLATION OF STEEL GUARDRAIL ALONG KATSINA ROAD
COMPLETED
50
CONSTRUCTION OF 4NO. REINFORCED CONCRETE PEDESTRIAN BRIDGE AT VARIOUS LOCATION ACROSS THE STATE
ONGOING
51
REHABILITATION OF DORAYI BABBA TO KUNTAU ROAD IN GWALE LGA, KANO
ONGOING
52
CONSTRUCTION OF KOFAR WAIKA - U/DABAI - 'YAN KUJE - W/BYEPASS GWALE LGA, KANO
ONGOING
53
CONTINUATION OF DUNKU - SHIYAN - NINGAWA ROAD, MADOBI LGA, KANO
ONGOING
54
CONTINUATION OF HAWAN GANJI - BADARI - KADERE ROAD GWARZO LGA, KANO
ONGOING
55
EXTENSION OF OVERHEAD STREEL PEDESTRIAN BDRIGES AT KURNA BABBAN LAYI , KURNA MAKARANTA AND KANDAHAR IN FAGGE/DALA LGA, KANO
ONGOING
56
CONSTRUCTION OF JANGUZA - DURUM - KABO - KARAYE ROAD, IN KUMBOST/TOFA/RIMIN GADO/KABO/KARAYE
ONGOING
57
PROVISION OF INFRASTRUCTURES AT THREE MODERN CITIES: KWANKWASIYYA, AMANA AND BANDIRAWA CITY IN KUMBOTSO/DAWAKIN TOFA LGA
ONGOING
58
COMPLETION/DUALIZATION OF KOFAR DAWANAU - DANDINSHE - KWANAR MADUGU ROAD (PHASE II) IN DALA LGA
ONGOING
59
COMPLETION OF PANSHEKARA ROUNDABOUT (DUALIZATION OF SANI ABACHA YOUTH CENTRE) MADOBI BRIDGE ROAD IN KUMBOTSO/GWALE LGA, KANO
COMPLETED
60
RECONSTRUCTION OF A COLLAPSED CULVERT ALONG TAKAI - FAJEWA - KAYARDA - BIRNIN BAKO ROAD IN TAKAI LGA, KANO
TAKEN OVER BY FEDERAL GOVERNMENT
61
EXPANSION OF ZARIA ROAD IN KMC/TARAUNI/KUMBOTSO LGA
ONGOING
62
COSNTRUCTION OF 2NO. 4.0M X 3.5M MULTI-CELSS BOX CULVERTS AT RAFIN GORA AND RAFIN ZUR IN YALWA WARD, RANO LGA, KANO
ONGOING
63
RECONSTRUCTION/DUALIZATION OF GOVERNMENT HOUSE ROUND ABOUT - LODGE ROAD - RACE COURSE ROAD - DAULA HOTEL ROUNDABOUT IN NASSARAWA LGA, KANO
ONGOING
64
CONSTRUCTION OF KURA - KUBARACHI - MADOBI ROAD AND RECONSTRUCTION OF FAILED KUBARACHI BRIDGE IN KURA/MADOBI LGA, KANO
ONGOING
65
CONSTRUCTION OF ACCESS ROAD AT KANO STATE ULTRA-MODERN SPECIALIST HOSPITAL, GIGINYU IN NASSARAWA LGA, KANO
COMPLETED
66
MAINTENANCE OF PANSHEKARA/MADOBI JUNCTION - PANSHEKARA TOWN ROAD
ONGOING
67
REHABILITATION/ASPHALTIC OVERLAY OF A ROAD FROM AIRPORT GAT - TRIUMPH ROUND ABOUT - MM WAY FLYOVER - KSIP ROUNDABOUT (AHMADU BELLO WAY) IN NASSARAWA LGA, KANO
ONGOING
68
REHABILITATION/ASPHALTIC OVERLAY OF A ROAD FROM AIRPORT JUNCTION - ASHTON ROAD - AIRPORT ROAD - CLUB ROAD - MM WAY ROUNDABOUT IN NASSARAWA LGA, KANO
ONGOING
69
REHABILITATION/ASPHATIC OVERLAY OF A MUAMMAD BUHARI ROAD (KABUGA UNDERPASS - KATSINA ROAD UNDERPASS)
ONGOING
70
PROVISION OF PRIMARY INTERVENTION ON DANBARE (OFF GWARZO ROAD, NEAR BUK NEW SITE) MADOBI ROAD
ONGOING
71
PRIMARY INTERVENTION MEASURES ON 'YANDODO - MAI ALLO ROAD
ONGOING
72
CONSTRUCTION OF 3N. RC BOX CULVERTS LAONG KWANAR DURBA - FAMMAR - KONAU - KURE ROAD IN KIBIYA LGA, KANO
COMPLETED
73
REPAIRS OF EMBANKMENT OF DOUBLE ARCO CULVERT AT KWARIN HAGO ALONG DAWAKIN TOFA - DAWANAU ROAD
ONGOING
74
RECONSTRUCTION OF 2no. MULTI-CELL BOX CULVERT (10-CELLS 4M X 4.5M X 12M AND 8 CELLS 4M X 4M X 12M) ALONG SHANONO - DUMBULU ROAD IN SHANONO LGA, KANO
ONGOING
75
CONSTRUCITON OF PANDA - HAMDULLAH - ALBASU - SAKWAYAN DUTSE
MOBILIATION STAGE
76
CONSTRUCTION OF ROGO - BARI - FALGORE - MAHANGI ROAD
ONGOING
77
CONSTRUCTION OF ROAD NETWORK AT RIJIYAR LEMO
ONGOING
78
CONSTRUCTION OF DORAWAR 'YAN KIFI ROAD AND OTHER ROAD NETWORK AT RIJIYAR ZAKI, KANO.
ONGOING
79
MAINTENANCE OF GAMJI - KASUWAR KUKA ROAD IN MAKODA AND GHARI LGAs
COMPLETED
80
REHABILITATION/ASPHALTIC OVERLAY OF SHARADA ROAD (DAN AGUNDI INTERCHANGE - PANSHEKARA UNDERPASS
ONGOING
81
REHABILITATION/ASPHALTIC OVERLAY OF MURTALA MOHD WAY (CLUB ROAD ROUND ABOUT) BOMPAI ROAD (CENTRAL HOTEL) AUDU BAKO WAY (MAGWAN ROAD - STATE ROAD JUNCTION), KANO
ONGOING
82
REHABILITATION/ASPHALTIC OVERLAY OF A ROAD FROM GIDAN MALLAM AMINU KANO (MUMBAYYA HOUSE) - TAL'UDU JUNCTION - GADON KAYA - YAHAYA GUSAU ROAD - SHARADA ROAD, KANO
RECENTLY AWARDED
83
REHABILITATION/ASPHALTIC OVERLAY OF A ROAD FROM MUMBAYYA HOUSE TO KOFAR MAZUGAL TO TRIUMP ROUNDABOUT IN KANO
RECENTLY AWARDED
84
COMPLETION OF 4NO REINFORCED CONCRETE PEDESTRIAN BRIDGES AT SHEIKH JAFAR ROAD, KWANAR DAWAKI, SABUWAR KOFA, MUSA ILIYASU COLLEGE.
ONGOING
85
CONSTRUCTION OF SECURITY PLAZA AT HADEJIA AND GWARZO ROAD
ONGOING
86
CONTROL OF EROSION MENACE AT GARANGA BRIDGE IN BUNKURE LGA
ONGOING
87
CONSTRUCTION OF KOFAR WAIKA TO UNGUWAR DABAI TO SABON RAMI TO KANKARE TO YANKUJE ROAD
ONGOING
88
CONSTRUCTION OF DANAGUNDI INTERCHANGE FLYOVER AND UNDERPASS
ONGOING
89
CONSTRUCTION OF UNGUWA UKU YAN-AWAKI TO LIMAWA JUNCTION ROAD IN TARAUNI LGA
ONGOING
90
CONSTRUCTION OF TAL'UDU INTERCHANGE (CLOVER LEAF FLYOVER)
ONGOING
91
CONTROL OF EROSION MENACE AT PANSHEKARA/SABON TITI UNDER PASS
COMPLETED
92
REPAIRS/MAINTENANCE OF STEEL PEDESTRIAN BRIDGE AT BUK OLD SITE, LEGAL AND SA'ADATU RIMI
COMPLETED
93
REPAIRS AND MAINTENANCE OF RABIU MUSA KWANKWASO AND OBASANJO FLYOVERS
COMPLETED
94
REPAIRS/REPLACEMENT & INSTALLATION OF STEEL GUARDRAIL ALONG KATSINA ROAD
COMPLETED
95
REPAIRS OF 2NO. ARMCO CULVERTS ALONG RANO TO RURUM ROAD IN RANO LGA
COMPLETED
96
MAINTENANCE OF ADDITIONAL 10NO. SELECTED METROPOLITANT ROADS
COMPLETED
97
MAINTENANCE OF KATSINA ROAD UNDER PASS
COMPLETED
98
RENOVATION WORKS AT DEPUTY GOVERNOR'S LODGE 51 MISSISSIPI STREET MAITAMA ABUJA
ONGOING
99
RENOVATION OF CORONATION HALL GOVT HOUSE KANO
COMPLETED
100
CONSTRUCTION OF DRAINAGE AT YUSUF MAITAMA SULE ROAD (DAWAKI ROAD) IN NASARAWA GRA
COMPLETED
101
PROPOSED ROUTINE MAINTENANCE OF MUHAMMADU BUHARI ROAD
COMPLETED
102
PROPOSED ROUTINE MAINTENANCE OF KURMAWA PRISON ROAD, GWARZO ROAD, KWANAR SABO-TSAMIYYAN BOKA-CHULA AND YAHAYA GUSAU ROAD
COMPLETED
103
CONSTRUCTION OF OFFICE COMPLEX FOR THE DUE PROCESS BUREAU AND SUPPLY OF FURNITURE
COMPLETED
104
RECONSTRUCTION OF WALL FENCE AT MINISTRY OF INFORMATION KANO
COMPLETED
105
PROCUREMENT OF FURNITURE AT MALAM AMINU KANO HOUSE, ASOKORO ABUJA, KANO STATE GOVERNORS LODGE
COMPLETED
106
RENOVATION AND MODIFICATION OF GOVERNORS OFFICE COMPLEX GOVERNMENT HOUSE KANO STATE
COMPLETED
107
RENOVATION MALAM AMINU KANO HOUSE, ASOKORO ABUJA, KANO STATE GOVERNORS LODGE
COMPLETED
108
PROCUREMENT OF 5NO. OPERATIONAL VEHICLE FOR KHET FUND, PHIMA, KNCDC
COMPLETED
109
PROCUREMENT OF SPORTING KITS TO 600 FOOTBALL TEAMS ACROSS 44 LOCAL GOVERNMNET AREA, KANO STATE
COMPLETED
110
EMPOWERMENT OF 2000 YOUTHS WITH CAPITAL AND MATERIALS TO START POS BUSINESS
COMPLETED
111
REHABILITATION WORKS FOR OFFICE AND LABORATORY DEPERTMENT
COMPLETED
112
PURCHASE OF HYDROLOGY & METEROLOGY EQUIPMENT
COMPLETED
113
PROCUREMENT OF ASSORTED FOOD MATERIALS/ GRAINS FOR PALLIATIVE DISTRIBUTION TO POOR AND VULNERABLE CITIZEN OF THE STATE
COMPLETED
114
PROCUREMENT OF START-UP KITS FOR VULCANIZERS IN KANO STATE
COMPLETED
115
PROCUREMENT OF FURNITURE GOVERNORS OFFICE COMPLEX KANO STATE GOVT. HOUSE, KANO
COMPLETED
116
RENOVATION HASIYA BAYERO PEDIATRIC HOSPITAL EMIRS PALACE ROAD, KANO
COMPLETED
117
RENOVATION OF YADA KUNYA LEPROSY HOSPITAL AT BELA IN UNGOGO LGA
COMPLETED
118
REPAIRS OF ROOF LEAKAGES AT MINISTRY OF PLANNING AND BUDGET, KANO
COMPLETED
119
RENOVATION WORKS AT VARIOUS CHARLETS IN GOVERNMENT HOUSE
COMPLETED
120
RENOVATION OF ROOF LEAKAGE AT MINISTRY OF JUSTICE KANO
COMPLETED
121
CONSTRUCTION OF ACCESS ROAD TO KANO STATE ULTRA MODERN MUHAMMADU BUHARI SPECIALIST HOSPITAL
COMPLETED
122
CONSTRUCTION OF COVERED SEWAGE CONDIT/ROAD ALONG JAKARA-KWARIN GOGAU RIVER (PHASE I)
COMPLETED
123
CONSTRUCTION OF FIVE (5) KILOMETER ROAD IN GEZAWA LOCAL GOVERNMENT HEADQUARTERS
COMPLETED
124
REPAIRS OF 2NO. ARMCO CULVERTS ALONG BICHI-GWARZO ROAD IN BAGWAI LOCAL GOVERNMENT AREA
COMPLETED
125
RE-CONSTRUCTION OF CIRCULAR CONCRETE SEWAAGE DRAIN AT KWANKWASIYYA CITY
ONGOING
126
CONSTRUCTION OF FIVE (5) KILOMETER DUAL CARRIAGEWAY AT KABO LOCAL GOVERNMENT, KANO STATE
ONGOING
127
CONSTRUCTION OF KWARIN AKUYA-SABON BIRNI ROAD, KURNAR ASABE, FAGGE LOCAL GOVERNMENT AREA
COMPLETED
128
REHABILITATION OF BAYERO SOLI ROAD PROV. OF OFF RAMP LINKING ZOO ROAD TO ADO BAYERO MALL
COMPLETED
129
CONSTRUCTION OF GADAR YAN MOTA BOX CULVERT ADJECENT TO YAN KWANUKA, JAKARA MUNICIPAL LOCAL GOVERNMENT AREA
ONGOING
130
SUPPLY AND INSTALLATION UNDERGROUND ELECTRICITY COMPACT SYSTEM AT KWANKASIYYA CITY.
ONGOING
131
SUPPLY AND RETROFIT INSTALLATION OF ANTI-THIEFT INTEGERETED SOLAR POWERED STREETLIGHT WITHIN KANO METROPOLIS
COMPLETED
132
INSTALLATION OF ALL-IN-ONE SOLAR POWERED STREETLIGHT AT AYAGI AND ITS NEIGHBORHOOD
COMPLETED
133
RENOVATION OF OFFICES FOR THE CHAIRMAN ANTI-PHONE SNATCHINGTAX FORCE COMMITTEE AT CORONATION HALL AT GOVERNMENT HOUSE KANO
COMPLETED
134
RELOCATION OF WUDIL TECHNICAL TO WRECA WORKSHOP AT TIGA, BEBEJI L.G.A KANO STATE
COMPLETED
135
RENOVATION WORKS AT KANO STATE REFORM COMMISSION, MILLER ROAD KANO
COMPLETED
136
RENOVATION, EXTENSION AND MODIFICATION OF FAMILY WING AT GOVERNMENT HOUSE, KANO
COMPLETED
137
RENOVATION WORKS AT DEPUTY GOVERNOR'S OFFICE, GOVERNMENT HOUSE KANO
ONGOING
138
PROVISION AND INSTALLATION OF GANTRY SIGNAGES, SIGNBOARDS AND ROAD STUDS ON ELEVEN NUMBER ROADS IN KANO METROPOLIS
COMPLETED
139
MAINTENANCE WORKS AT RABIU MUSA KWANKWASO FLY OVER/OBSANJO FLYOVER BRIDGE
COMPLETED
140
EXCAVATION OF DEMOLISHED BUILDING DEBRIS AT KANO EID GROUND PRAYER
COMPLETED
141
CONSTRUCTION OF DIVERSION ROAD AT TAL'UDU INTERCHANGE
COMPLETED
142
REPAIRS/MAINTENANCE OF STEEL PEDESTRIAN BRIDGE AT BUK OLD SITE, LEGAL AND SAADATU RIMI
COMPLETED
143
CONSTRUCTION OF KOFAR WAIKA-UNGUWAR DABAI-SABON RAMI-KANKARE-YANKUJE ROAD IN GWALE L.G.A
ONGOING
144
CONSTRUCTION OF FIVE (5) KILOMETER ROAD IN GWARZO LOCAL GOVERNMENT HEADQUATERS
COMPLETED
145
MAINTENANCE OF PANSHEKARA/MADOBI JUNCTION-PANSHEKARA TOWN ROAD
COMPLETED
146
CONSTRUCTION OF MULTI CELL BOX CULVERT AT RAFIN YABAWA IN MINJIBIR LGA
ONGOING
147
REHABILITATION OF DORAYI BABBA TO KUNTAU ROAD
ONGOING
148
CONSTRUCTION OF 4N0. PEDESTRIAN BRIDGE AT 4N0. LOCATION OF GWARZO ROAD, BUK, HADEJIA AND SHIEK JAAFAR ROAD
ONGOING
149
CONSTRUCTION OF 5KM DUAL CARRIAGE WAY IN ALBASU L.G.A
COMPLETED
150
CONSTRUCTION OF 5KM DUAL CARRIAGE WAY IN DAWAKIN KUDU L.G.A
COMPLETED
151
CONSTRUCTION OF KOFAR DANAGUNDI INTERCHANGE (FLYOVER & INTERCHANGE)
ONGOING
152
CONSTRUCTION OF TAL'UDU INTERCHANGE PROJECT
ONGOING
153
CONSTRUCTION OF RING (PIPE) DRAINAGE AND INTERLOCKING TILES AT SANI ABACHA SKILLS ACQUISITION CENTER FAGGE L.G.A
COMPLETED
154
DUALIZATION OF GOVERNMENT HOUSE ROUND ABOUT-LODGE ROAD - RACE COURSE ROAD - DAULA HOTEL ROUND ABOUT
ONGOING
155
CONSTRUCTION OF COLAPSED CULVERT ALONG TAKAI-FAJEWA-KAYAYARAD-BIRNIN BAKO ROAD IN TAKAI LGA
ONGOING
156
CONSTRUCTION OF DRAIANGE NETWORK AT INDABAWA QUARTERS, KANO MUNICIPAL LGA
ONGOING
157
CONSTRUCTION OF 5KM DUAL 5KM CARRIAG WAY IN KIRU L.G.A
ONGOING
158
CONSTRUCTION OF 2NO. 4X3.5M 8-CELL BOX CULVERT AT RAFIN GORA AND RAFIN ZUR ALONG KAZAURAWA AND GANA VILLAGES IN YALWA WARD
ONGOING
159
RENOVATION WORKS HORTICULTURE INSTITUTE BAGAUDA, BEBEJI LOCAL GOVERNMENT AREA
ONGOING
160
RENOVATION WORKS AT LIVESTOCK INSTITUTE, BAGAUDA KANO
ONGOING
161
RENOVATION WORK AND CONSTRUCTION OF 5-DAILY PRAYER MASJID AT FARM MECHANIZATION INSTITUTE, GWARZO LOCAL GOVERNMENT AREA
COMPLETED
162
CONSTRUCTION OF KANO STATE DUE PROCESS BUREAU OFFICE COMPLEX
COMPLETED
163
RENOVATION WORKS AT FISHERIES INSTITUTE MAGAGA GUDE, KABO LOCAL GOVERNMENT AREA
COMPLETED
164
RENOVATION OF SCHOOL STRUCTURES AT MAITAMA SULE SCIENCE COLLEGE
ONGOING
165
CONSTRUCTION OF WARAKA SEXUAL ASSAULT AT GAYA GENERAL HOSPITAL
COMPLETED
166
RENOVATION WORKS AT CIVIL SERVICE COMMISSION, AUDU BAKO SECRETARIAT KANO
ONGOING
167
GENERAL RENOVATION WORKS AT ALL MINISTRIES, DEPARTMENTS AND AGENCIES (MDA's) AT AUDU BAKO SECRETARIAT, KANO
ONGOING
168
RENOVATION WORKS AND CONSTRACTION OF 12 SEATER TOILETS/ABLUTION AT MURTALA MUHAMMAD MOSQUE, HAUSAWA KANO
COMPLETED
169
RENOVATION OF 6NO. COURTS ATB STATE HIGH COURT PREMISES, AUDU BAKO SECRETARIAT, KANO
ONGOING
170
CONVERSION OF GIDAN MURTALA GROUND FLOOR IN TO MINISTRY OF SOLID MINERALS
COMPLETED
171
RENOVATION WORKS AT INFORMATICS INSTITUTE KURA, KURA L.G.A
COMPLETED
172
GENRAL RENOVATION WORKS AT KANO CORPORATE SECURITY INSTITUTE, GABASAWA
ONGOING
173
GENERAL RENOVATION WORKS AND LAYING OF ARTIFICIAL TURF GRASSES AT SANI ABACHA STADIUM, K/MATA KANO
COMPLETED
174
COMPLETION OF CONSTRUCTION WORKS AT COLLEGE OF NURSING AND MIDWIFERY AT MADOBI L.G.A
COMPLETED
175
CONSTRUCTION OF STANDARD MAGISTRATE COURT AT AUDU BAKO SECRETARIAT
ONGOING
176
FINAL RETENT5ION FOR THE RENOVATION WORKS OF STOREY BUILDING BLOCKS 1 & 2 AT KAWO GIGINYU, NASARAWA L.G.A
COMPLETED
177
CONSTRUCTION OF EARTH ROAD AT DANLADI NASISI LAYIN ALMANARA SCHOOL WITH LINK TO JIDO HOUSING ESTATE
ONGOING
178
GENERAL RENOVATION WORKS AT FARM MECHANISATION INSTITUTE, KADAWA, KANO STATE
ONGOING
179
CONSTRUCTION/RE-DESIGN OF KOFAR MATA EID-GROUND (FILIN IDI) AND ISLAMIC ARENA
ONGOING
180
MAINTENANCE OF ADDITIONAL 10N0. SELECTED METROPOLITANT ROADS
COMPLETED
181
MAINTENANCE OF KATSINA ROAD UNDER PASS
COMPLETED
182
MAINTENANCE/REHABILITATION OF EQUIPMENT AND MACHINE FOR KARMA
COMPLETED
183
PROPOSED ROUTINE MAINTENANCE OF MUHAMMADU BUHARI ROAD
ONGOING
184
PROPOSED ROUTINE MAINTENANCE OF KURMAWA PRISON ROAD, GWARZO ROAD, KWANAR SABO-TSAMIYYAN BOKA-CHULA AND YAHAYA GUSAU ROAD
COMPLETED
185
MAINTENANCE OF KATSINA ROAD UNDER PASS
COMPLETED
186
RENOVATION OF DRIVING INSTITUTE AT ZARIA ROAD
COMPLETED
187
REPAIRS/MAINTAINANCE OF GIRL CHILD BUSES/TATA LAYLAND BUSES
COMPLETED
188
WATER PIPELINE DISTRIBUTION SYSTEM AT NAIBAWA BYE PASS LAYOUT AND UNGUWA UKU YAN AWAKI AREAS ALONG ESTERN BYE PASS ROAD, KANO STATE.
ONGOING
189
CONTRUCTION OF SOLAR POWERED BOREHOLE WITH 2,000-LTRS PLASTIC OVERHEAD TANKAND PROVISION OF 80W (ALL-IN- ONE)SOLAR STREET LIGHT AT MAKARANTAR MALAM YA'U FANISAU, UNGOGGO L.G.A. KANO STATE.
COMPLETED
190
CONSTRUCTION OF SOLAR POWERED BOREHOLE BASED WATER SUPPLY SCHEME AT GODA TOWN IN MINJIBIR L.G.A.
ONGOING
191
LAYIN OF 1000MM D.I PIPE FROM TAMBURAWA TO HADEJIA ROAD
ONGOING
192
EMERGENCY RENOVATION WORKS AT YADAKUNYA LEPROSY HOSPITAL, BELA TOWN KANO
COMPLETED
193
EMERGENCY GENERAL RENOVATION WORKS AT HASIYA BAYERO PAEDIATRIC HOSPITAL, K/KUDU KANO
COMPLETED
194
PROPOSED RENOVATION WORKS/REPAIRS AT CABINET OFFICE PHASE I
COMPLETED
195
PROPOSED RENOVATION WORKS AT HORTICULTURE INSTITUTE BAGAUDA
COMPLETED
196
PROPOSED RENOVATION WORKS AT LIVESTOCK INSTITUTE, BAGAUDA
COMPLETED
197
PROPOSED RENOVATION WORKS AT FISHERIES INSTITUTE, BAGAUDA
COMPLETED
198
GENERAL RENOVATION WORKS AT CORPORATE SECURITY INSTITUTE, GABASAWA
COMPLETED
199
REVALIDATION OF CONTRACT FOR THE GENERAL RENOVATION WORKS AT BAMALLI NUHU HOSPITAL
COMPLETED
200
GENERAL RENOVATION WORKS AT KANO STATE LAW REFORM COMMISSION
COMPLETED
201
PROPOSED CONSTRUCTION OF NURUL AL-BABA ISLAMIYYA AT GIGINYU, NASSARAWA LGA, KANO
COMPLETED
202
GENERAL RENOVATION WORKS AND CONSTRUCTION OF ADDITIONAL BLOCKS AT REFORMATORY INSTITUE, KIRU
COMPLETED
203
GENERAL RENOVATION WORKS AT KANO DRIVING INSTITUTE
COMPLETED
204
GENERAL RENOVATION WORKS AT POULTRY INSTITUTE TUKWI
COMPLETED
205
PROPOSED RENOVATION WORKS AT EMERGENCY AND PHARMACY UNITS OF MURTALA MUHAMMAD SPECIALIST HOSPITAL
COMPLETED
206
RENOVATION WORKS AND CONSTRUCTION OF 12-SEATER TOILET AND ABLUTION AREA AT MASALLACIN MURTALA, HAUSAWA KANO
COMPLETED
207
RENOVATION WORKS AT MINISTRY OF WOMEN AFFAIRS AND COMMUNITY DEVELOPMENT, KANO STATE.
COMPLETED
208
PURCHASE OF 5no. HOUSING UNITS AT KURA LGA (FMBN/NLC/TUC/NECA)
COMPLETED
209
GENERAL RENOVATION OF MOSQUE AT RADIO KANO BROADCASTING HOUSE
COMPLETED
210
RENOVATION WORKS AT LATE ENGR. AYUBA RESIDENCE ZOO ROAD HAUSAWA
COMPLETED
211
RENOVATION WORKS AT LATE ALH. UBALE RESIDENCE IN MINJIBIR
COMPLETED
212
RENOVATION WORKS AT LATE ALH. SHEHU RESIDENCE AT GEZAWA
COMPLETED
213
CONSTRUCTION OF WALL FENCE AT THE EXISTING GRAVE YART SITUATED AT R/ZAKI (MAKABARTA BYEPASS)
COMPLETED
214
URGENT REHABILITATION OF HOSTELS AND TOILETS AT NYSC ORIENTATION CAMP, KUSALLA KARAYE LGA
COMPLETED
215
GENERAL RENOVATION WORKS AT ISOLATION CENTRE YAR'GAYA D/KUDU LGA
COMPLETED
216
RENOVATION WORKS AT ALHAJI YUSUF RESIDENCE SITUTAED AT RIJIYAR GWANGWAN
COMPLETED
217
RENOVATION/CONSTRUCTION AND CONVERSION WORKS AT FORM KASUBA, POLICY STRATEGY IMPLEMENTATION AND GUEST HOUSE BEHIND CORONATION HALL (PHASE I)
COMPLETED
218
SUPPLY AND INSTALLATION OF CLASSROOM FURNITURE & HOSTEL DOUBLE DECKER BEDS AT CORPORATE SECURITY TRAINING INSTITUTE, GABASAWA
COMPLETED
219
COMPLETED
220
PROPOSED RENOVATION OF CLASSES ON DECKING AT MASALLACIN GIDAN KASA, R/ZAKI (ASSISTANCE)
COMPLETED
221
GENERAL RENOVATION AND FURNISHING OF OFFICE FOR THE DIRECTORATE OF YOUTH & EMPOWERMENT
COMPLETED
222
RENOVATION WORKS AT THE OFFICES OF THE HEAD OF CIVIL SERVICE, AUDU BAKO SECT.
COMPLETED
223
RENOVATION/PURCHASE OF EQUIPMENT FOR THE OFFICE OF HON. COMMISSIONER MINISTRY FOR WOMEN AFFAIRS & SOCIAL DEVELOPMENT
COMPLETED
224
RENOVATION WORKS AT THE OFFICE OF SSR ARTV I & II
COMPLETED
225
CONSTRUCTION OF WALL FENCING AT RADIO KANO JOGANA TRANSMISSION STATION
COMPLETED
226
COMPLETION OF MADARASATUL SABILUL HUDA AL-ISLAMIYYA PRIMARY SCHOOL, FARAWA MAIDUGURI ROAD.
COMPLETED
227
EMERGENCY ROOF LEAKAGES REPAIRS AT MINISTRY OF PLANNING & BUDGET, AUDU BAKO SECRETARIAT
COMPLETED
228
COMPLETION OF MOSQUE ISLAMIYYA SCHOOL AND CONSTRUCTION OF 2no. SEATER TOILET AT S/KOFA K/NASSARAWA (MUBI)
COMPLETED
229
REACTIVATION OF SECURITY OBSERVATION TOWR AT KOFAR NASSARAWA FLYOVER BRIDGE
COMPLETED
230
GENERAL RENOVATION WORKS AT MINISTRY FOR SPECIAL DUTIES
COMPLETED
231
GENERAL PAINTING WORKS ON ALL WALLS OF PUBLIC BUILDINGS FROM STATE ROAD TO BUK ROAD IN THE METROPOLIS
COMPLETED
232
RENOVATION OF WALL FENCE AT CORPORATE SECUIRTY TRAINING INSTIUTE GABASAWA
COMPLETED
233
PROPOSED GENERAL RENOVATION WORKS AT THE VEHICLE INSPECTION OFFICERS HEADQUARTERS, ALONG ZARIA ROAD, KANO
COMPLETED
234
GENERAL RENOVATION WORKS AT ABUBAKAR RIMI TELEVISION CORPORATION (ARTV)
COMPLETED
235
RENOVATION WORKS AND FURNISHING AT MINISTRY OF INTERNAL SECURITY & HOME AFFAIRS SITUATED AT ARTV BUILDING
COMPLETED
236
RENOVATION OF PUBLIC ACCOUNT COMMITTEE OFFICE AT KOFAR NASSARAWA
COMPLETED
237
CONSTRUCTION OF OFFICE HEADQUARTERS FOR THE NEIGHBOURHOOD WATCH VIGILANTE GROUP AT HOTORO, TARAUNI LGA
COMPLETED
238
RENOVATION AND FURNISHING OF CONFERENCE HALL AT SCHOOL FOR ARABIC STUDIES (SAS) KANO STATE
COMPLETED
239
EMERGENCY WORK FOR THE RELOCATION OF KANO CENTRAL PRISON TO 3000 CAPACITY JANGUZA CENTRAL CUSTODIAL FACILITY
COMPLETED
240
COMPLETION OF JUMA'AT MOSQUE WALL FENCE AND POLICE OUTPOST AT GOBIRAWA QUARTERS
COMPLETED
241
SUPPLY OF TOOLS AND MAINTENANCE OF 7no. GRAVE YARDS IN KANO METROPOLIS
COMPLETED
242
PROPOSED CONVERSION OF APPEALS SECTION AT KNARDA TO SERVE AS OFFICE COMPLEX FOR THE ESTABLISHMENT OF NEWLY CREATED MINISTRY
COMPLETED
243
GENERAL RENOVATION/REHABILITATION WORKS AT MUHAMMAD ABDULLAHI WASE HOSPITAL, PHASE II
COMPLETED
244
CONSTRUCTION OF WALL FENCE AT SAGAGI GRAVE YARD KANO
COMPLETED
245
ADDITIONAL FACILITIES AT NUHU BAMALLI HOSPITAL K/NASSARAWA
COMPLETED
246
REVALIDATION OF CONTRACT FOR THE CONSTRUCTION OF 20no. SOLAR POWERED BOREHOLES ACROSS THE STATE
COMPLETED
247
REVALIDATION OF CONTRACT FOR THE CONSTRUCTION OF DUE PROCESS BUREAU OFFICE COMPLEX, MAGAJIN RUMFA KANO
COMPLETED
248
REVALIDATION OF CONSTRUCTION OF MAGISTRATE COURT AT SHANONO LGA
ONGOING
249
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT 2 AT AUDU BAKO SECRETARIAT
ONGOING
250
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT AT BUNKURE LGA
ONGOING
251
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT RIMIN GADO LGA, KANO
ONGOING
252
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT AT ZAKIRAI, GABASAWA LGA, KANO
ONGOING
253
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT AT GWAMMAJA, DALA LGA, KANO
ONGOING
254
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT GWAMMAJA, DALA LGA, KANO
ONGOING
255
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT AT ZUNGERU ROAD, KANO
ONGOING
256
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT U/UKU, ZARIA ROAD TARAUNI LGA, KANO
ONGOING
257
REVALIDATION OF CONSTRUCTION OF STANDARD MAGISTRATE COURT AT KABO LGA, KANO
ONGOING
258
REVALIDATION OF MILESTONE PAYMENT IN RESPECT OF THE CONSTRUCTION OF FACULTY BUILDING COMPLEX AT YUSUF MAITAMA SULE UNIVERSITY, KANO
COMPLETED
259
REVALIDATION OF COMPLETION OF THE RENOVATION WORKS AT POLICE HEADQUARTERS KANO STATE COMMAND, BOMPAI
ONGOING
260
REVALIDATION OF CONTRACT FOR THE RENOVATION, EXTENSION AND CONSTRUCTION OF MOSQUE AT NUHU BAMALLI HOSPITAL, K/NASSARAWA
COMPLETED
261
REVALIDATION OF RENOVATION OF 6no. COURTS AT THE STATE HIGH COURT PREMISES, AUDU BAKO SECRETARIAT
COMPLETED
262
REVALIDATION OF CONTRACT FOR THE RELOCATION OF WUDIL TECHNICAL COLLEGE TO FORMER WRECA WORKSHOP TIGA
COMPLETED
263
REVALIDATION OF CONTRACT FOR THE RENOVATION OF STOREY BUILDING BLOCK 1 & 2 AT KAWO GIGINYU, NASSARAWA LGA, KANO
COMPLETED
264
REVALIDATION OF CONTRACT FOR THE CONSTRUCTION OF 1no. LECTURE THEATRE HALL, STUDENTS COMMON ROOM AND ACCESS ROAD/LANDSCAPING AT AMINU KANO COLLEGE OF ISLAMIC & LEGAL STUDIES, KANO
ONGOING
265
REVALIDATION OF CONTRACT FOR THE CONSTRUCTION OF STOREY BLOCK AND 5-DAILY PRAYER MOSQUE, UNDERGROUND WATER TANK, ABLUTION AREA AND INTERLOCK AT SERVICOM DIRECTORATE OFFICE
ONGOING
266
REVALIDATION OF CONTRACT FOR THE CONSTRUCTION OF 4NO. STUDENT HOSTEL, ROAD NETWORK, WALKWAY ANDDRAINAGE AT RABIU MUSA KWANKWASO COLLEGE OF ADVANCE & REMEDIAL STUDIES T/WADA LGA
ONGOING
267
REVALIDATION OF CONTRACT AND REIVEW OF RATES IN RESPECT OF THE CONSTRUCTION OF ULTRA MODERN MARKET AT KWANKWASO TOWN, MADOBI
ONGOING
268
CONSTRUCTION OF PRINTING TECHNOLOGY DEVELOPMENT CENTRE AT GOVERNMENT PRINTING PRESS, KANO
ONGOING
269
PROPOSED CONSTRUCTION OF BLOCK WALL FENCE & 2no. GATES/GATE HOUES AT BANDIRAWO CITY KANO STATE
ONGOING
270
CONSTRUCTION OF WALL FENCE AT FIRE SERVICE STATION DAKATA, KANO
ONGOING
271
CONSTRUCTION OF OFFICE COMPLEX, FEMALE MOSQUE, CONFERENCE HALL AND RENOVATION WORKS AT HISBAH BOARD, SHARADA KANO
ONGOING
272
CONSTRUCTION OF ISLMIYYA SCHOOL AT RIJIYAR GWANGWAN, JIDO WARD D/KUDU LGA
ONGOING
273
CONSTRUCTION OF JUMA'AT MASJID FOR RIJIYAR GWANGWAN COMMUNITY, JIDO WARD ALONG MAIDUGURI ROAD
ONGOING
274
CONSTRUCTION OF MAGISTRATE COURTS COMPLEX AT THE PREMISES OF GIDAN MURTALA
ONGOING
275
CONSTRUCTION OF ARCHIVE REGISTRY, JUDICIAL SCHOOL AND ALTERNATE DISPUTE RESOLUTION HALL AT SHARIA COURT OF APPEAL, KANO
ONGOING
276
GENERAL RENOVATION WORKS AT MUHAMMAD ABDULLAHI WASE TEACHING HOSPITAL
ONGOING
277
GENERAL RENOVATION WORKS AT KANO FILM ACADEMY, TIGA BEBEJI LGA
ONGOING
278
GENERAL RENOVATION WORKS AND PROVISION OF FACILITIES AT GOVERNMENT PRINTING PRESS, ALONG EMIR'S PALACE
ONGOING
279
GENERAL RENOVATION WORKS AND COMPLETION OF ABANDONED PROJECT AT MINISTRY OF SCIENCE, TECHNOLOGY AND INNOVATION, KANO STATE
ONGOING
280
PHASE I GENERAL REHABILTATION AND UPGRADING OF KANO STATE HISTORY & CULTURE BUREAU (GIDAN DANHAUSA)
ONGOING
281
GENERAL RENOVATION WORKS OF ALL MDAs AT AUDU BAKO SECRETARIAT OFFICE COMPLEX, KANO STATE
ONGOING
282
RENOVATION OF ADMINISTRATIVE BLOCK AND CONSTRUCTION OF STAFF QUARTERS AT NIGERIAN LAW SCHOOL (KANO CAMPUS), BAGAUDA
ONGOING
283
RENOVATION AND CONVERSION OF PART OF KANO STATE LIBRARY INTO OFFICE COMPLEX FOR MINISTRY OF TRANSPORT AND OFFICE FOR SPECIAL ADVISERS
ONGOING
284
PROPOSED CONSTRUCTION OF SHEHU MAIHULA ISLAMIYYA SCHOOL AT DISO QUARTERS, GWALE LGA
ONGOING
285
GENERAL RENOVATION OF GIDAN MURTALA OFFICE COMPLEX, KANO
ONGOING
286
RENOVATION AND CONSTRUCTION WORKS AT KANO STATE INDEPENDENCE ELECTORAL COMMISSION (KANSIEC)
ONGOING
287
(PHASE I) GENERAL RENOVATION AND REMODELLING OF KANO STATE PENSION FUND TRUSTEES
ONGOING
288
COMPLETION OF ABANDONED PROJECT AND RENOVATION OF EXISTING BUIDING AT GIDAN DANHAUSA
ONGOING
289
RENOVATION AND CONSTRUCTION WORKS AT MINISTRY OF YOUTH & SPORTS DEVELOPMENT DAN HAUSA ROAD, KANO
ONGOING
290
PROPOSED REMODELLING OF THE ARMED FORCES REMEMBRANCE COMPLEX AT DOTSA VILLAGE ZARIA ROAD
ONGOING
291
REMODELLING AND REHABILITATION OF OFFICE ACCOMODATION FOR THE SPECIAL ADVISER TO HIS EXCELLENCY ON LABOUR AFFAIRS
ONGOING
292
RENOVATION OF MEDICAL CLINICS AT REMAND HOME G/DUTSE, TOREY HOME T/MALIKI, VVF HOSTEL KWALLI AND NASSARAWA CHILDREN HOME
ONGOING
293
PROPOSED RENOVATION WORKS AT THE NIGERIA SECURITY & CIVIL DEFENCE CORPS STATE COMMAND, KWANKWASIYYA CITY ZARIA ROAD
ONGOING
294
PROPOSED RENOVATION WORKS AT NATIONAL AGENCY FOR THE PROHIBITION OF TRAFFICKING PERSON (NAPTIP) AMANA CITY
ONGOING
295
COMPLETION WORKS & CONSTRUCTION OF ADDITION STRUCTURES AT KAROTA PREMIES, KANO
ONGOING
296
GENERAL RENOVATION WORKS AT DAKATA DIVISIONAL POLICE STATION, KANO STATE COMMAND
ONGOING
297
PROPOSED RENOVATION WORKS/FURNISHING OF 3no. FEDERAL HIGH COURT JUDGES QUARTERS AT NO. 5 YUSUF ROAD BOMPAI KANO.
ONGOING
298
RE-VITTALIZATIZE KANO STATE CULTURE HOUSE BI-MINSTA MONUMENT
ONGOING
299
GENERAL RENOVATION WORKS AT SCHOOL OF TECHNOLOGY, MATAN FADA ROAD, KANO
ONGOING
300
GENERAL RENOVATION OF IMAM HOUSE AND PROVISION OF PAS AT MASALLACIN MURTALA
ONGOING
301
RENOVATION WORKS AT GUIDANCE AND COUNSELLING BOARD OFFICE COMPLEX, OPPOSITE EMIR'S PALACE K/KUDU KANO.
ONGOING
302
RENOVATION OF ADO BAYERO JUMA'AT MOSQUE AT JA'EN GWALE LGA
ONGOING
303
PROCUREMENT OF 500 UNITS OF TRANSFORMERS TO VARIOUS LOCATION ACROSS 44 LGAS, KANO STATE
ONGOING
304
ROAD CONSTRUCTIION IN RESPECT OF CONSTRUCTON OF (900M) 2 COAT SURFACE DRESSING ROAD FROM KADAWA–BYEPASS IN GWALE LOCAL GOVERNMENT AREA,KANO STATE
COMPLETED
305
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF KALANKASA –SHARIFAI FEEDER ROAD,KABO LOCAL GOVERNMENT,KANO STATE
ONGOING
306
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF( 1.3KM) FEEDER ROAD FROM YADAKWARI-UNGUWAR KUDU IN GARUM MALAM,LOCAL GOVERNMENT AREA,KANO STATE
ONGOING
307
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (3KM) FEEDER ROAD,FROM TASHAR ULELE –JAGAJA IN TOFA LOCAL GOVERNMENT,KANO STATE
ONGOING
308
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (2.5KM) FEEDER ROAD FROM TUNGA- BYE PASS IN GWALE LOCAL GOVERNMENT,KANO STATE
ONGOING
309
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (800M) 2 COAT SURFACE DRESSING FROM SHEIK JAFAR-GIDAN SARKI DORAYI IN GWALE LOCAL GOVERNMENT AREA KANO STATE.
ONGOING
310
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (11 KM)I FEEDER ROAD FROM KWANAR DAN TAKO-FAGOJI- KWAZAZZABONYAN KWANDO IN KIRU LOCAL GOVERNMEN AREAT,KANO STATE
ONGOING
311
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (3KM) FEEDER ROAD FROM MIL GOMA KURMA IN DAWAKIN KUDU LOCAL GOVERNMENT AREA, KANO STATE
ONGOING
312
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF(5.7 KM) FEEDER ROAD FROM GADANYA-SANTAR JOBE-JOBE ROAD IN BAGWAI LOCAL GOVERNMEN AREA,KANO STATE.
ONGOING
313
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF( 3KM)FEEDER ROAD FROM JOBE- GODARAWA IN SHANONO LOCAL GOVERNMENT AREA,KANO STATE
ONGOING
314
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF (1KM) FEEDER ROAD FROM MAI RAKUMI-WAIIKA ROAD IN GWALE LOCAL GOVERNMET AREA, KANO STATE
ONGOING
315
ROAD CONSTRUCTIION N RESPECT OF CONSTRUCTON OF( 500M) 2 COAT SURFACE DRESSING ROAD FROM SHEIK JAFAR- GAREJIN KAMILU- U/FAKO IN GWALE LOCAL GOVERNMENT AREA, KANO STATE
ONGOING
316
CONSTRUCTION OF FALGORE-GIDAN YAJI- DAYASAN MAKERA FEEDER ROAD IN ROGO L.G.A
COMPLETED
317
CONSTRUCTION OF AKALAWA TO DAN ISA FEEDER ROAD IN RIMIN GADO L.G.A
COMPLETED
318
CONSTRUCTION OF KWAGAR KANAWA-NASARA FEEDER ROAD IN GEZAWA L.G.A
COMPLETED
319
CONSTRUCTION OF KWANAR NAIRA - CHILORI - MAGAMARU FEEDER ROAD IN ALBASU L.G.A
COMPLETED
320
CONSTRUCTION OF TASHAR KALANKASA TO SHARIFAR ROAD IN KANO LGA
ONGOING
321
CONSTRUCTION OF 3 KILOMETERS FEEDER ROAD AT KWANAR NASARA IN GEZAWA LGA
ONGOING
322
CONSTRUCTION OF RIMIN GADO TO BUTU-BUTU ROAD
ONGOING
323
CONSTRUCTION OF TOFA MODEL TO GAJIDA TO WATARI FEEDER ROAD
ONGOING
324
CONSTRUCTION OF KWANAR BANDALAWA TO JAGAJA ROAD IN TOFA LGA
ONGOING
325
CONSTRUCTION OF KULLUWA TO KULLAWA TO JALABI ROAD IN BUNKURE LGA
ONGOING
326
CONSTRUCTION OF 13km ROAD FROM GANI TO DAGORA IN SUMAILA LGA
ONGOING
327
CONSTRUCTION OF HAWAN GANJI TO BADARI ROAD IN GWARZO LGA
ONGOING
328
CONSTRUCTION OF A BRIDGE AND ACCESS ROAD FROM WUDIL TO ZUMBULALA TO MAIDA IN WUDIL LGA
ONGOING
329
CONSTRUCTION OF PANDA - HAMDULLAHI - ALBASU - SAKWAYAN DUTSE ROAD
ONGOING
330
CONSTRUCTION OF ROGO TO BARI TO MAHANGI ROAD IN ROGO LOCAL GOVERNMENT
ONGOING
331
CONSTRUCTION OF DAMBATTA TO DIGGOL ROAD
ONGOING
332
CONSTRUCTION OF WASAI TO BAITA ROAD
ONGOING
333
CONSTRUCTION OF RURUM ROAD
ONGOING
334
CONSTRUCTION OF KUBARACHI BRIDGE AND KURA - KUBARACHI ROAD
ONGOING
335
CONSTRUCTION OF KWANKWASO-NINGAWA-DUNKU ROAD
ONGOING
336
CONSTRUCTION OF MADABI-YAKO-KIRU TO KWANAR DANGORA ROAD
ONGOING
337
CONSTRUCTION OF GWARZO-TSAURE-TSANYAWA ROAD
ONGOING
338
DAMBATTA - MAKODA - DANZABUWA - KUNCHI AND DANMARKE - JIGAWAR SATAME ROADS
ONGOING
339
BUNKURE - BONO, KAUSANI - MICHIKA AND 'YANDOJI
ONGOING
340
YADAKWARI TO UNGUWA KUDU FEEDER ROAD IN GARUN MALAM LGA
ONGOING
341
RURAL ACCESS LONG ROAD AT GURDUBA TO UNGUWAR BA TO ZANGON GULIYA IN AJINGI LGA
ONGOING
342
CONSTRUCTION OF CROSS DRAINAGE AND BOX CULVETS AT GADAMA ROAD IN KUMBOTSO LGA
ONGOING
343
RURAL ACCESS KULLUWA TO JALABI IN BUNKURE
ONGOING
344
RURAL ACCESS KWANAR BANDALAWA TO ULELE VILLAGE TOFA LGA
ONGOING
345
RURAL ACCESS TOFA TO GAJIDA IN TOFA LGA
ONGOING
346
RURAL ACCESS KALANKASA TO SHARIFAI VILLAGE KABO LGA
ONGOING
347
RURAL ACCESS AKALAWAR DAN ISA IN RIMIN GADO LGA
ONGOING
348
RURAL FALGORE-GIDAN YARI-DAYASAN ROGO LGA
ONGOING
349
TUNGA BY PASS GWALE LGA
ONGOING
350
RURAL ACCESS TASHAR ULELE-JAGAJA TOFA LGA
ONGOING
351
KADAWA BY PASS KWALE LGA
ONGOING
352
RIJIYAR TANGWA - UNGUWAR FAGE DAWAKIN KUDU LGA
ONGOING
353
RENOVATION OF GANDUN ALBASA SPECIAL PRIMARY SCHOOL
COMPLETED
354
CONVERSION OF MARIRI REHABILITATION CENTER TO IDP GIRLS SCIENCE AND TECHNICAL COLLEGE
COMPLETED
355
GENERAL REPAIRS AND RENOVATION DELAPIDATED STRUCTURES AT GSS HAUSAWA
COMPLETED
356
SUPPLY OF LABORATORY EQUIPMENT FOR 100N0. SECONDARY SCHOOLS ACORSS 44 LGAS
ONGOING
357
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GJSS CHULA
ONGOING
358
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GJSS ALBASU
ONGOING
359
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE UMBAWAR LIMAN PRIMARY SCHOOL IN BAGWAI LGA
ONGOING
360
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GGSS BEBEJI
ONGOING
361
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE SABONLAYI PRIMARY SCHOOL BICHI
COMPLETED
362
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE BUNKURE GAB AS SPS
ONGOING
363
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ULUMUDDEEN ISLAMIYYA PRIMARY SCHOOL KOFAR KUDU,
ONGOING
364
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE D/TOFA MODEL PRIMARY SCHOOL D/TOFA LGA
ONGOING
365
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE YELWA MODEL PRIMARY SCHOOL
ONGOING
366
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE TAGWAYE PRIMARY SCHOOL
ONGOING
367
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GJSS RUFA’I DOGUWA
YET TO START
368
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE THIMARUL QURAN JUMA’AT MOSQUE FAGGE LGA
ONGOING
369
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE KAWO SPECIAL PRIMARY SCHOOL GABASAWA
ONGOING
370
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE AT KUNCHI LGA
ONGOING
371
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ZANGO CFSI GARKO LGA
ONGOING
372
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE HAYIN NAYAYA PRIMARY SCHOOL CHIROMAWA G/MALAM
ONGOING
373
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GYANAWA PS AT GAYA LGA
ONGOING
374
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GEZAWA CHIKIN GARI PRI.SCH. AT GEZAWA
ONGOING
375
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE NAMADI PS UNGUWAR JAKADA AT GWALE LGA
ONGOING
376
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ZANGO PRIMARY SCHOOL
ONGOING
377
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE KABO MODEL PRIMARY SCHOOL AT KABO LGA
ONGOING
378
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GJISS MR. UKU KOFAR FADA AT KARAYE LGA
ONGOING
379
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE KIBIYA SPS
ONGOING
380
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ZANGO PRIMARY SCHOOL KIRU K/KUDU
COMPLETED
381
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE KUMBOTSO SPECIAL PRIMARY SCHOOL IN KUMBOTSO LGA
COMPLETED
382
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE SUMAKAI SCIENCE & MATHS PRIMARY SACHOOL AT KURA LGA
ONGOING
383
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE MADOBI IYA PRIMARY SCHOOL AT MADOBI LGA
COMPLETED
384
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE KANTUDU PRIMARY SCHOOL AT DANBATTA LGA
ONGOING
385
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE MINJIBIR GABAS PRIMARY SCHOOL
ONGOING
386
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE MHE ISLAYYA PRIMARY SCHOOL AT KMC LGA
ONGOING
387
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ABUBAKAR YUSUF GJSS HOTORON KUDU AT NASARAWA LGA
COMPLETED
388
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE MAAJI ALI GJSS RANO AT RANO LGA
ONGOING
389
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE ZANGO I PRIMARY SCHOOL AT RIMIN GADO LGA
ONGOING
390
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GGSS ROGO LGA
ONGOING
391
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE SHANONO CFI AT SHANONO LGA
ONGOING
392
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE SUMAILA GABAS PRIMARY SCHOL
ONGOING
393
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE T/WADA MODEL PRIMARY SCHOOL
COMPLETED
394
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE NEW SCIENCE PRIMARY SCHOOL, TAKAI
ONGOING
395
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE DARMANAWA GADAR KARFE
ONGOING
396
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE TOFA LIP PRIMARY SCHOOL
ONGOING
397
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GJSS STADIUM TSANYAWA CIKIN GARI
ONGOING
398
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE UNGOGO SPECIAL PRIMARY SCHOOL
ONGOING
399
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE GARIN DAU PRIMARY SCHOOL
ONGOING
400
CONSTRUCTION OF 1 STOREY BLOCK OF 4 CLASSROOMS WITH OFFICE INDABO CENTRAL PRIMARY SCHOOL AT WUDIL LGA
ONGOING
401
RENOVATION WORKS AT GGSS GANDUN ALBASA
COMPLETED
402
RENOVATION WORKS AT GOVERNOR'S COLLEGE KANO
ONGOING
403
RENOVATION WORKS AT NEW GGST
ONGOING
404
RENOVATION WORKS AT GGASS T/WADA
COMPLETED
405
RENOVATION WORKS AT SCIENCE & TECHNICAL COLLEGE KARAYE
COMPLETED
406
RENOVATION WORKS AT GOVERNMENT SECONDARY SCHOOL KARAYE
COMPLETED
407
RENOVATION WORKS AT SENATOR BELLO HAYATU GIRLS TECHNICAL COLLEGE
COMPLETED
408
RENOVATION WORKS AT GOVERNMENT SECONDARY SCHOOL UNGUWAR GYARTAI IN KUNCHI LGA
COMPLETED
409
RENOVATION WORKS AT GOVERNMENT SECONDARY SCHOOL RIMI
COMPLETED
410
RENOVATION WORKS AT GOVERNMENT SECONDARY SCHOOL AGINJI
COMPLETED
411
RENOVATION WORKS AT GSS ALBASU
COMPLETED
412
RENOVATION WORKS AT MAITAMA SULE SCIENCE COLLEGE GAYA
COMPLETED
413
RENOVATION WORKS AT ALMAJIRI BOARDING SCHOOL HARBAU IN TSANYAWA LGA
COMPLETED
414
RENOVATION WORKS AT ALMAJIRI BOARDING SCHOOL DANDINSHE IN DALA LGA
COMPLETED
415
CONSTRUCTION OF WALL FENCE AT AMINU KANO COLLEGE OF LEGAL AND ISLAMIC STUDIES
ONGOING
416
CONSTRUCTION OF POULTRY HOUSE AND ANIMAL SHADE AT YUSUF MAITAMA SULE UNIVERSITY KANO
ONGOING
417
CONSTRUCTION OF THREATER AT AMINU KANO COLLEGE OF LEGAL AND ISLAMIC STUDIES
ONGOING
418
CONSTRUCTION AND RENOVATION WORKS AT SCHOOL OF HEALTH TECHNOLOGY, KANO
COMPLETED
419
COMPLETION OF KADAWA HOSPITAL
COMPLETED
420
GENERAL RENOVATION AND UPGRADING OF "D" WARD FOR THE ESTSBLISHMENT OF SICKLE CELL UNIT AT MURTALA MUHAMMAD SPECIALIST HOSPITAL
ONGOING
421
RE-UPGRADING OF WALL FENCE HEIGHT AND RENOVATION WORKS AT SCHOOL OF NURSING KANO AND MIDWIFERY DANBATTA
COMPLETED
422
CONSTRUCTION OF WARAKA SEXUAL ASSAULT REFERRAL CENTER KARAYE GENERAL HOSPITAL, KANO
ONGOING
423
RECONSTRUCTION OF MAIN GATE/GUARD ROOM AND RENOVATION WORKS AT SCHOOL OF NURSING KANO
COMPLETED
424
ADDITIONAL WORKS AT KAFIN MAI YAKI PRIMARY HEALTH IN KIRU L.G.A KANO
ONGOING
425
GENERAL RENOVATION AND REHABILITATION OF DANBATTA GENERAL HOSPITAL
ONGOING
426
GENERAL RENOVATION AND REHABILITATION OF MINJIBIR GENERAL HOSPITAL
ONGOING
427
GENERAL RENOVATION AND REHABILITATION OF BEBEJI GENERAL HOSPITAL
ONGOING
428
SIR MUHAMMAD SUNUSI SPECIALIST HOSPITAL
ONGOING
429
SHEIK MUHAMMAD JIDDA GENERAL HOSPITAL
ONGOING
430
GENERAL RENOVATION AND REHABILITATION OF FAGWALAWA COTTAGE HOSPITAL
ONGOING
431
GENERAL RENOVATION AND REHABILITATION OF D/KUDU GENERAL HOSPITAL
ONGOING
432
GENERAL RENOVATION AND REHABILITATION OF GEZAWA GENERAL HOSPITAL
ONGOING
433
GENERAL RENOVATION AND REHABILITATION OF IMAM WALI GENERAL HOSPITAL
ONGOING
434
CONSTRUCTION OF OFFICES, MOSQUE AND PARKING SHADE AT THE PERMANENT SITE OF KHETFUND
YET TO START
435
SUPPLY AND INSTALLATIONS OF MEDICAL EQUIPMENT AT GWARZO GENERAL HOSPITAL
COMPLETED
436
INCREASED THE HEALTH ALLOCATION FROM N40BN TO N71BN.
COMPLETED
437
ENSURING COMPETENT HANDS ARE APPOINTED AS HEADS OF AGENCIES.
COMPLETED
438
RESTORATION OF NON-HEALTH WORKERS SALARIES (CONHESS) REMOVED BY THE PREVIOUS ADMINISTRATION FOR MORE THAN SEVEN YEARS
COMPLETED
439
PURCHASE OF OFFICE EQUIPMENTS/WORKING MATERIALS TO MINISTRY (FOURTH QUARTER 2023 AND FIRST QUARTER 2024).
COMPLETED
440
UNSCHEDULED VISIT TO HEALTH FACILITIES TO ENSURE SERVICE DELIVERY IS RENDERED EFFECTIVELY.
COMPLETED
441
CONTINUED SUPERVISION TO HEALTH FACILITIES.
COMPLETED
442
HEALTH CARE SYSTEM STRENGTHENING INCLUDING TRAINING AND RETRAINING OF HEALTH CARE PERSONNEL.
COMPLETED
443
SUSTAINED MATERNAL DEATH REVIEW TO ASCERTAIN ACTUAL CAUSE OF MATERNAL AND CHILD MORTALITY.
COMPLETED
444
EMPLOYMENT OF OVER 70 ADDITIONAL NURSES AND MIDWIVES DEPLOYED TO RURAL HEALTH FACILITIES.
COMPLETED
445
RESTORATION OF THE LOST GLORY OF THE STATE OWNED COLLEGES OF HEALTH SCIENCES BY ENSURING RIGHT PERSONS ARE HEADING THE INSTITUTIONS.
COMPLETED
446
REHABILITATION/RENOVATION WORKS AT SCHOOLS OF NURSING KANO, MIDWIFERY DANBATTA AND HEALTH TECHNOLOGY KANO.
ONGOING
447
RE-CAPTURING/RE-EQUIPPING AND RE-FURNISHING OF HASIYA BAYERO PAEDIATRICS HOSPITAL. THE FACILITY WAS RE- COMMISSIONED BY HIS EXCELLENCY, THE EXECUTIVE GOVERNOR OF KANO STATE.
COMPLETED
448
FREE DISTRIBUTION OF DRUGS/LABORATORY CONSUMABLES TO ALL PATIENTS ATTENDING HASIYA BAYERO PAEDIATRIC HOSPITAL FROM THE INCEPTION OF THE PROGRAMME AS DIRECTED BY HIS EXCELLENCY, THE EXECUTIVE GOVERNOR OF KANO STATE FROM AUGUST TO DECEMBER 2023. THE DRUGS/LABORATORY CONSUMABLES DISTRIBUTED TO PATIENTS.
COMPLETED
449
REHABILITATION AND RE-EQUIPPING OF ACCIDENT AND EMERGENCY UNIT OF MURTALA MUHAMMAD SPECIALIST HOSPITAL. THE UNIT HAS BEEN COMMISSIONED BY HIS EXCELLENCY.
COMPLETED
450
RECRUITING AND EMPLOYING OF 36 HOUSE OFFICERS AND 70 MEDICAL OFFICERS TO SERVE AT VARIOUS HEALTH FACILITIES IN THE STATE.
COMPLETED
451
REDEPLOYMENT OF THE NEWLY EMPLOYED MEDICAL DOCTORS TO SERVE AT BOTH THE PRIMARY AND SECONDARY HEALTH FACILITIES IN THE STATE.
COMPLETED
452
REHABILITATION OF YADAKUNYA LEPROSY HOSPITAL. DRUGS AND CONSUMABLES WERE SUPPLIED FOR FREE DISTRIBUTION TO THE PATIENTS.
COMPLETED
453
EMPLOYMENT OF 250 DRS AND 155 CHEWS/NURSES/MIDWIVES.
COMPLETED
454
EMPLOYMENT OF 250 SECURITY PERSONNEL.
COMPLETED
455
AWAITING APPROVAL FOR EMPLOYMENT/REPLACEMENT OF OFFICERS ACROSS ALL CADRES IN THE HEALTH SYSTEM.
COMPLETED
456
DECOMMISSIONING OF MRI,CT SCAN,MAMMOGRAM MACHINES(GOVERNMENT FUNDING)
COMPLETED
457
REPAIR OF X-RAY MACHINE AT MURTALA MUHAMMAD SPECIALIST HOSPITAL
COMPLETED
458
UP-GRADING OF DIALYSIS UNITS, 2 NEW. AMOUNTING TO 7 FUNCTIONAL DIALYSIS UNITS
COMPLETED
459
SOLARISATION OF HMB AND YARGAYA ISOLATION CENTRE
COMPLETED
460
OTHER REPAIRS AT YARGAYA ISOLATION CENTRE SUCH AS PROVISION OF FUNCTIONAL AMBULANCE, SOME COLLAPSED AREAS OF THE BUILDING, PROVISION OF ACTIVE GENERATOR AND WATER SYSTEM
COMPLETED
461
PURCHASE OF NEW X-RAY MACHINE AT ABUBAKAR IMAM UROLOGY CENTER
COMPLETED
462
CONTINUOUS SUPPLY OF QUARTERLY HOSPITAL STATIONARIES WORTH 93MILLION NAIRA
COMPLETED
463
SOLARISATION OF MARMARA MATERNITY HOSPITAL AND SOME PART OF SHEIK MUHAMMAD JIDDA GENERAL HOSPITAL.
COMPLETED
464
GENERAL REPAIRS AT YARGAYA ISOLATION CENTRE
COMPLETED
465
RENOVATION AND COMPLETION OF NUHU BAMALLI MATERNITY HOSPITAL.
COMPLETED
466
RENOVATION AND COMPLETION OF YADAKUNYA GENERAL HOSPITAL.
COMPLETED
467
RE-VITALIZATION OF OCCUPATIONAL/ENVIRONMENTAL HEALTH LABORATORY (PURCHASE OF LABORATORY EQUIPMENTS/REAGENTS, REHABILITATION WORK AND CAPACITY BUILDING OF THE STAFF).
COMPLETED
468
ESTABLISHMENT OF PROJECT IMPLEMENTATION UNIT (PIU) AT MURTALA MUHAMMAD SPECIALIST HOSPITAL FOR EMERGENCY MEDICAL SERVICES AND AMBULANCE SYSTEM.
COMPLETED
469
GENERAL RENOVATION/RENOVATION WORKS AT D-WARD OF MURTALA MUHAMMAD SPECIALIST HOSPITAL TO FACILITATE THE ESTABLISHMENT OF SICKLE CELL UNIT.
COMPLETED
470
COMPLETION OF COMMUNITY HOSPITAL AT KADAWA QUARTERS IN GWALE LOCAL GOVERNMENT AREA.
COMPLETED
471
REHABILITATION OF OLD STRUCTURE/PURCHASE OF LAB AND X-RAY EQUIPMENT FOR TOFA COMPREHENSIVE HEALTH CENTRE
COMPLETED
472
COMPLETION OF KADAWA COMMUNITY HOSPITAL AT GWALE LGA.
COMPLETED
473
RENOVATION OF TOFA COMPREHENSIVE CENTRE AT TOFA LGA
COMPLETED
474
UPGRADING OF G/MALAM PHC TO GENERAL HOSPITAL
ONGOING
475
UPGRADING OF GARKO PHC TO GENERAL HOSPITAL
ONGOING
476
UPGRADING OF GHARI PHC TO GENERAL HOSPITAL
ONGOING
477
UPGRADING OF ALBASU PHC TO GENERAL HOSPITAL
ONGOING
478
UPGRADING OF R/GADO PHC TO GENERAL HOSPITAL
ONGOING
479
UPGRADING OF KUMBOTSO PHC TO GENERAL HOSPITAL
ONGOING
480
UPGRADING OF TIGA GENERAL HOSPITAL
ONGOING
481
REHABILITATION/RENOVATION WORKS AT WAZIRI SHEHU GIDADO GENERAL HOSPITAL
ONGOING
482
REHABILITATION/RENOVATION WORKS AT TUDUN-WADA GENERAL HOSPITAL
ONGOING
483
UPGRADING OF GABASAWA HEALTH CENTRE TO GENERAL HOSPITAL
ONGOING
484
GENERAL RENOVATION/REHABILITATION WORKS AT SHEIK MUHAMMAD JIDDAH GENERAL HOSPITAL
ONGOING
485
CONSTRUCTION OF COMPREHENSIVE PRIMARY HEALTH CARE AT UNGUWA UKU, TARAUNI LGA
ONGOING
486
GENERAL RENOVATION WORKS AT TIGA GENERAL HOSPITAL
ONGOING
487
GENERAL RENOVATION WORKS AT MUHAMMAD ABDULLAHI WASE TEACHING HOSPITAL
ONGOING
488
GENERAL RENOVATION WORKS AT KURA GENERAL HOSPITAL
ONGOING
489
UPGRADING & REVITALIZATION OF ELEVEN PHCS
ONGOING
490
PROCUREMENT OF OPERATIONAL VEHICLES TO HEALTH AGENCIES OF KHETFUND, PHIMA AND KNCDC TO FACILITATE THE SMOOTH RUNNING OF THEIR ASSIGNED RESPONSIBILITIES OF THE AGENCIES.
COMPLETED
491
MAPPING OUT MODALITIES TOWARDS SETTLING OFF THE N1.2B OUTSTANDING PAYMENTS THE DRUGS AND MEDICAL CONSUMABLES SUPPLY AGENCY (DMCSA) OWING DRUGS SUPPLIERS.
COMPLETED
492
CONSTRUCTION/RENOVATION AT NEW SITE OF DRUGS AND MEDICAL CONSUMABLES SUPPLY AGENCY (DMCSA), KWANAR KWANKWASO.
COMPLETED
493
CONSTRUCTION OF PHARMA GRADE WAREHOUSE AT DRUGS AND MEDICAL CONSUMABLE SUPPLY AGENCY (DMCSA) IN COLLABORATION WITH UNICEF.
COMPLETED
494
UNVEILING KANO STATE HEALTH TRUST FUNDS (KHETFUND) BENEFICIARY GUIDE AS GUIDELINE FOR ACCESSING FUND FROM THE AGENCY BY HEALTH FACILITIES AND HEALTH EDUCATIONAL INSTITUTIONS.
COMPLETED
495
CLOSING DOWN PRIVATE HEALTH INSTITUTIONS AND DIAGNOSIS CENTRES OPERATING ILLEGALLY IN THE STATE.
COMPLETED
496
KANO STATE CENTRE FOR DISEASE CONTROL BILL WAS PASSED INTO LAW BY THE KANO STATE HOUSE OF ASSEMBLY. KANO STATE IS THE ONLY STATE WITH SUB-NATIONAL CENTRE FOR DISEASE CONTROL IN THE COUNTRY.
COMPLETED
497
CONSTRUCTION/RENOVATION AT INFECTIOUS DISEASE HOSPITAL TO ACCOMMODATE NEW KANO STATE CENTRE FOR DISEASE CONTROL.
COMPLETED
498
SOLARISATION OF STATE PHCMB HEADQUARTERS, STATE COLD STORE AND SIX ZONAL COLD STORES
COMPLETED
499
CONSTRUCTION OF NEW ZONE 1 AND GENERAL RENOVATION OF OLD ZONE 1 HEADQUARTERS
COMPLETED
500
ESTABLISHMENT OF SICKLE CELL TREATMENT CENTRE AT MURTALA MUHAMMAD SPECIALIST HOSPITAL.
COMPLETED
501
ESTABLISHMENT OF THE DIPHTHERIA TREATMENT CENTRES AT MURTALA MUHAMMAD SPECIALIST HOSPITAL AND INFECTIOUS DISEASE HOSPITALS (IDH).
COMPLETED
502
SUCCESSFUL CONDUCT OF PHASE ONE AND TWO OF DIPHTHERIA MASS VACCINATION CAMPAIGNS.
COMPLETED
503
4-DAY STATE LEVEL EMERGENCY RESPONSE MANAGEMENT (ERM) OBR-2 CAMPAIGN IN APRIL 2024.
COMPLETED
504
INAUGURATION OF STATE TASKFORCE ON POLIO IMMUNIZATION HEADED BY HIS EXCELLENCY, THE DEPUTY GOVERNOR, COMRADE AMINU ABDUSSALAM, TO CURB SPREAD AND RESURFACE OF POLIO VARIANT IN THE STATE.
COMPLETED
505
SUCCESSFUL CONDUCT OF 2024 POLIO OBR3, OBR4 AND OBR5 CAMPAIGN.
COMPLETED
506
RE-INTRODUCTION OF KWANKWASIYYA MEDICAL OUTREACH IN THE STATE.
COMPLETED
507
SUCCESSFUL CONDUCT OF 2023 NATIONAL TB TESTING WEEK IN COLLABORATION WITH THE TB PARTNERS.
COMPLETED
508
SUCCESSFUL CONDUCT OF PHASE ONE OF THE SEASONAL MALARIA CHEMOPREVENTION EXERCISE.
COMPLETED
509
SUCCESSFUL CONDUCT OF POLIO IMMUNIZATION TO AVOID RESURFACING OF THE DISEASE IN THE STATE.
COMPLETED
510
DISTRIBUTION OF FREE MATERNAL AND CHILD HEALTH COMMODITIES (PHASE ONE AND TWO) TO BOTH PRIMARY AND SECONDARY HEALTH FACILITIES IN THE STATE.
COMPLETED
511
SCREENING OF 1,800 BENEFICIARIES OF AUREN GATA IN THE STATE.
COMPLETED
512
CREATION/FORMAL INAUGURATION OF THE HEALTH SECTOR PLANNING AND BUDGETING COMMITTEE.
COMPLETED
513
DISSEMINATION OF HUMAN RESOURCE FOR HEALTH LEARNING AGENDA PROJECT.
COMPLETED
514
REVIEW OF POLICY FOR TASK SHIFTING/TASK SHARING.
COMPLETED
515
VALIDATION OF THE DEVELOPED 2024 ANNUAL OPERATIONAL PLAN (AOP).
COMPLETED
516
VALIDATION OF THE DEVELOPED 2025 ANNUAL OPERATIONAL PLAN (AOP).
COMPLETED
517
SUCCESSFUL CONDUCT OF 1ST AND 2ND MATERNAL, NEWBORN AND CHILD HEALTH WEEK
COMPLETED
518
ENROLMENT OF 300,000 VULNERABLE KANO RESIDENTS INTO KSCHMA FREE SERVICES.
COMPLETED
519
COMBATING MALNUTRITION AND IMPROVING CHILD HEALTH.
COMPLETED
520
ENROLMENT OF 1000 OF SICKLE CELL PATIENTS INTO KSCHMA SCHEME UNDER ABBA CARE PROJECT
COMPLETED
521
CEMENTING EXISTING RELATIONSHIP WITH DEVELOPMENT PARTNERS WORKING TO BOOSTING HEALTHCARE SYSTEM IN THE STATE.
COMPLETED
522
SECURING 467 CARTONS OF CONSUMABLES FROM THE WORLD HEALTH ORGANISATION (WHO) TO SUPPORT THE FIGHT AGAINST DIPHTHERIA IN THE STATE.
COMPLETED
523
ESTABLISHMENT OF SOLARIZED OXYGEN PLANT AT MUHAMMADU BUHARI GENERAL HOSPITAL SUPPORTED BY UNICEF.
COMPLETED
524
ESTABLISHMENT OF SPECIAL CARE BABY UNIT (SCBU) AT BICHI GENERAL HOSPITAL SUPPORTED BY THE UNICEF.
COMPLETED
525
ABBACARE: COMPREHENSIVE CONTRIBUTORY HEALTHCARE COVERAGE FOR SICKLE CELL PATIENTS, 100% FUNDED BY THE KANO STATE GOVERNMENT. TARGETING 39,000 SICKLE CELL PATIENTS’ INDIGENTS, WITH SOME ALREADY ACCESSING CARE AT SPECIALIST HOSPITALS
COMPLETED
526
ZAKAT AND WAQF PROGRAM: KSCHMA HAS DESIGNED THIS PROGRAM TO ACCOMMODATE ISLAMIC TEACHINGS OF ETHICAL FINANCING FOR VULNERABLE GROUPS, SUPPORTED BY PHILANTHROPISTS AND COMMUNITY MEMBERS.
COMPLETED
527
KSCHMA VULNERABLE PROGRAM HAS BEEN EXPANDED TO ENROLL THE UNDERSERVED POPULATION, WHICH INCLUDE PLHIV PATIENT, HYPERTENSIVE PATIENTS, DIABETIC, PATIENT WITH VESICO-VAGINAL FISTULA, WOMEN WHO BENEFICIARIES OF CEMONC.
COMPLETED
528
ELECTRONIC MEDICAL RECORDS (EMR): DEVELOPED AND DEPLOYED EMR AT 10 KSCHMA ENGAGED HEALTHCARE FACILITIES TO IMPROVE ACCURACY, EFFICIENCY, PATIENT CARE, AND DATA MANAGEMENT WHILE REDUCING COSTS.
COMPLETED
529
STUDENTS’ CONTRIBUTORY HEALTHCARE PROGRAM (SCHEP): EMPOWERING ALL STUDENTS IN PUBLIC AND PRIVATE TERTIARY INSTITUTIONS WITH COMPREHENSIVE HEALTHCARE COVERAGE AND ACCESS TO QUALITY HEALTHCARE WITHOUT FINANCIAL HARDSHIP WHILE THEY ARE IN SCHOOL. THE PROGRAM WAS FLAGGED OFF, AND MORE THAN 3,000 STUDENTS HAVE SO FAR BEEN ENROLLED ON THE SCHEME.
COMPLETED
530
REGULAR PREPARATION AND DISSEMINATION OF THE ENROLLEE REGISTER TO HEALTHCARE FACILITIES AND ENSURING THAT, SERVICE PROVIDERS HAVE UP-TO-DATE INFORMATION ON REGISTERED ENROLLEES, ENABLING THEM TO PROVIDE SERVICES ONLY TO ELIGIBLE ENROLLEES.
COMPLETED
531
MAIDEN HOUSE TO HOUSE VERIFICATION OF BHCPF ENROLLEES IN 22 LGAS WHERE 53,193 BENEFICIARIES WERE VERIFIED, EDUCATED AND LINKED WITH THEIR ASSIGNED HEALTHCARE FACILITIES RIGHT AT THEIR OWN DOORSTEPS
COMPLETED
532
DEVELOPMENT OF SERVICE CHARTER WHICH OUTLINES THE AGENCY’S COMMITMENT TO ITS STAKEHOLDERS AND THE STANDARDS OF SERVICE DELIVERY THEY CAN EXPECT. THIS IS ALIGNS WITH THE AGENCY’S COMMITMENT TO IMPROVING SERVICE QUALITY, ACCOUNTABILITY AND TRANSPARENCY.
COMPLETED
533
REVIEWED AND VALIDATED KSCHMA OPERATIONAL GUIDELINES WHICH PROVIDES RELEVANT, EFFICIENT AND EFFECTIVE GUIDE FOR IMPLEMENTING DAY-TO-DAY ACTIVITIES OF THE AGENCY
COMPLETED
534
IN A LANDMARK MOVE, THE AGENCY HAS UNCOVERED AND REMOVED 8,875 GHOST ENROLLEES FROM 10 HIGH VOLUME HEALTHCARE FACILITIES IN THE METROPOLIS, LEADING TO A SIGNIFICANT COST-SAVING OF 42,600,000 ON MONTHLY CAPITATION. THIS IS PART OF EFFORT TO ENHANCE TRANSPARENCY, ACCOUNTABILITY AND EFFICIENCY IN THE STATE HEALTHCARE SYSTEM.
COMPLETED
535
IN ADDRESSING THE PERSISTENT CHALLENGE OF DRUGS FREQUENTLY BEING OUT-OF-STOCK IN MANY ENGAGED HEALTHCARE FACILITIES, THE AGENCY TOOK PROACTIVE STEPS BY COLLABORATING WITH THE DMCSA THROUGH THE STATE SUSTAINABLE HEALTH COMMODITY SUPPLY SYSTEM COMMITTEE. THIS COLLABORATION RESULTED IN THE INTEGRATION OF KSCHMA DRUGS WITH DRF DRUGS, ALWAYS ENSURING A CONSISTENT AVAILABILITY OF MEDICATIONS
COMPLETED
536
THERE HAS BEEN A NOTEWORTHY RISE IN THE NUMBER OF ENROLLEES ACCESSING HEALTHCARE FACILITIES DURING THE REPORTING PERIOD, REFLECTING A HEIGHTENED SENSE OF CONFIDENCE AMONG BENEFICIARIES IN THE QUALITY OF SERVICES PROVIDED; RISING FROM 303,930 IN JUNE 2023 TO MORE THAN 380,000 BY THE END DECEMBER 2024. THIS REFLECTS A HEIGHTENED SENSE OF CONFIDENCE AMONG ENROLLEES IN THE QUALITY OF SERVICES PROVIDED.
COMPLETED
537
COMMENCEMENT OF THE STUDENTS CONTRIBUTORY HEALTHCARE PROGRAMME (SCHEP), THE ZAKKAT AND HUBSI, THE CHRISTIAN ASSOCIATION OF NIGERIA (CAN) PROGRAMME, THE COMMUNITY BASED CONTRIBUTORY HEALTHCARE PROGRAMME, SOCIAL HOMES AND REHABILITATION CENTRES
COMPLETED
538
THE AGENCY HAS COMMENCED THE IMPLEMENTATION OF THE WAQF PROGRAM, A FORM OF ETHICAL HEALTH FINANCING MECHANISM DESIGNED TO SUPPORT VULNERABLE GROUPS, BY LEVERAGING WAQF, THE AGENCY DEMONSTRATES ITS COMMITMENT TO PROMOTING SOCIAL JUSTICE AND EQUITY IN HEALTHCARE PROVISION. AS THE PROGRAM UNFOLDS, IT IS ANTICIPATED TO HAVE A POSITIVE IMPACT ON THE WELL-BEING OF VULNERABLE INDIVIDUALS AND COMMUNITIES, ENHANCING ACCESS TO ESSENTIAL HEALTHCARE SERVICES WHILE UPHOLDING ETHICAL STANDARDS.
COMPLETED
539
PROVISION OF 445ha OF IRRIGABLE LAND UP AND DOWNSTREAM OF THE WATARI IRRIGATION PROJECT IN BAGWAI LGA
COMPLETED
540
PROVISION OF 555ha AT KAFINCHIRI DAM IN GARKO LOCAL GOVERNMENT AREA
COMPLETED
541
RE-CONSTRUCTION OF 2.0MILLION CUBIC LITER CAPACITY GAFAN EARTH DAM IN BUNKURE LOCAL GOVERNMENT AREA LIBC UNDER ATASP
ONGOING
542
CREATION OF 5O0 HECTARES NEW IRRIGATION SCHEME AT DANSOSHIYA RESERVE INVOLVING CONSTRUCTION OF RESERVOIR AND VARIOUS IRRIGATION INFRASTRUCTURE
ONGOING
543
REPAIRS AND RENOVATION OF IRRIGATION INFRASTRUCTURE AT KADAWA IRRIGATION PROJECT SITES
ONGOING
544
REPAIRS AND RENOVATION OF IRRIGATION INFRASTRUCTURE AT BUNKURE IRRIGATION PROJECT SITES
ONGOING
545
REPAIRS AND RENOVATION OF IRRIGATION INFRASTRUCTURE AT JARMAN BAKA IRRIGATION PROJECT SITES
ONGOING
546
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT JAJAYE ROGO LGA
ONGOING
547
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT MALIKAWA GHARI KUNCHI LGA
ONGOING
548
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT SHANONO, SHANONO LGA
ONGOING
549
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT ALBASU, ALBASU LGA
ONGOING
550
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT DAWAKIN TOFA, DAWAKIN TOFA LGA
ONGOING
551
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT UNGOGO, UNGOGO LGA
ONGOING
552
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT DOGUWA, DOGUWA LGA
ONGOING
553
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT DAWAKIN KUDU, DAWAKIN KUDU LGA
ONGOING
554
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT SUMAILA, SUMAILA LGA
ONGOING
555
DESIGN AND CONSTRUCTION OF SMALL EARTH DAM WITH IRRIGATION INFRASTRUCTURE AT KIBIYA, KIBIYA LGA
ONGOING
556
CONSTRUCTION OF MILK STORAGE FACILITY FOR MILK AND MILK MARKETERS ASSOCIATION AT KOFAR WAMBAI, KANO
COMPLETED
557
UPGRATION OF CATTLE MARKET AT GETSO LOCAL GOVERNMENT AREA, KANO STATE
COMPLETED
558
UPGRATION OF CATTLE MARKET AT DAMBATTA LOCAL GOVERNMENT AREA, KANO STATE
COMPLETED
559
UPGRATION OF CATTLE MARKET AT FALGORE LOCAL GOVERNMENT AREA, KANO STATE
COMPLETED
560
UPGRATION OF CATTLE MARKET AT DUMBULUN, KANO STATE
COMPLETED
561
UPGRATION OF CATTLE MARKET AT WUDIL LOCAL GOVERNMENT AREA, KANO STATE
COMPLETED
562
CONSTRUCTION OF 4KM ROAD AND DRAINAGE AT DAWANAU INTERNATIONAL GRAINS MARKET
COMPLETED
563
INSTALLATION OF 20no. SOLAR POWERED LIGHTING POINTS AT DAWANAU INTERNATIONAL GRAINS MARKET
COMPLETED
564
CONSTRUCTION OF POLICE OUTPOST, MOSQUE, MARKET, INFORMATION SYSTEM AND TOILETS AT DAWANAU INTERNATIONAL GRAINS MARKET
COMPLETED
565
CONSTRUCTION OF OFFICE & CONFERENCE ROOM FOR THE MARKET ASSOCIATION AT DAWANAU INTERNATIONAL GRAINS MARKET
COMPLETED
566
PROCUREMENT FOR THE CONDUCT OF MEDICAL EXAMINATION FOR PROSPECTIVE ZAWARA COUPLE IN KANO STATE
COMPLETED
567
PROCUREMENT FOR THE CONDUCT OF MEDICAL EXAMINATION FOR PROSPECTIVE ZAWARA COUPLE IN KANO STATE
COMPLETED
568
REPAIRS OF VEHICLES FOR KWANKWASIYYA MEDICAL OUT REACHED PROGRAMME
COMPLETED
569
PROCUREMENT OF HOSPITAL EQUIPMENTS AT HASIYA BAYERO PEDIATRIC HOSPITAL EMIRS PALACE ROAD KANO
COMPLETED
570
PURCHASE OF OFFICE EQUIPMENTS/OTHER WORKING MATERIALS
COMPLETED
571
FACILITATED THE DEVELOPMENT OF THE KANO STATE CLIMATE CHANGE POLICY, PROVIDING THE FOUNDATIONAL FRAMEWORK FOR ALL MITIGATION AND ADAPTATION EFFORTS.
COMPLETED
572
REVIVED ENFORCEMENT OF THE KANO STATE ENVIRONMENTAL LAW (2022) BY REINSTATING REGULAR INSPECTIONS AND COMPLIANCE MEASURES.
COMPLETED
573
DEVELOPED THE KANO STATE ENVIRONMENTAL AND WASTE MANAGEMENT REGULATIONS (2025) TO STRENGTHEN STANDARDS ON WASTE HANDLING, DISPOSAL AND EMISSIONS.
COMPLETED
574
COMMENCED DEVELOPMENT OF THE KANO STATE CLIMATE CHANGE ACTION PLAN, CHARTING OUT SECTOR-SPECIFIC PROJECTS AND TIMELINES.
COMPLETED
575
DEVELOPED A STRATEGIC ROADMAP FOR THE MINISTRY, OUTLINING PRIORITIES, KPIS AND A FIVE-YEAR VISION FOR ENVIRONMENTAL GOVERNANCE.
COMPLETED
576
FORMED THE WASTE EVACUATION TASKFORCE, COORDINATING STATE AGENCIES AND PRIVATE OPERATORS TO STREAMLINE WASTE COLLECTION AND SITE REMEDIATION.
COMPLETED
577
ENGAGED VARIOUS STAKEHOLDERS ON “WASTE-TO-WEALTH” AND “WASTE-TO-ENERGY” INITIATIVES, EXPLORING OPPORTUNITIES TO CONVERT REFUSE INTO FERTILIZER, FUEL AND BIOGAS.
COMPLETED
578
FACILITATED PAYMENT OF A 9-MONTH SALARY BACKLOG FOR 2,369 STREET SWEEPERS, RESTORING MORALE AND UNINTERRUPTED SANITATION SERVICES.
COMPLETED
579
INSTALLED 25 SOLAR-POWERED BOREHOLES TO ENHANCE YEAR-ROUND WATER ACCESS AND CLIMATE RESILIENCE IN LOCAL COMMUNITIES.
COMPLETED
580
FACILITATED CONSTRUCTION OF THE SUMAILA EROSION CONTROL SITE, IMPLEMENTING STRUCTURAL AND VEGETATIVE MEASURES TO PROTECT VULNERABLE LAND.
COMPLETED
581
RENOVATED AND EQUIPPED THE POLLUTION CONTROL LABORATORY, UPGRADING ANALYTICAL CAPACITY FOR AIR, WATER AND SOIL TESTING.
COMPLETED
582
COMMENCED RENOVATION OF THE DORAYI COMPOST PLANT, KICK-STARTING LARGE-SCALE ORGANIC WASTE RECYCLING AND FERTILIZER PRODUCTION.
COMPLETED
583
ESTABLISHED 4 SOLAR-POWERED GREENHOUSES AT AUDU BAKO COLLEGE OF AGRICULTURE, DAMBATTA, DEMONSTRATING RENEWABLE-ENERGY APPLICATIONS IN AGRONOMY.
COMPLETED
584
COMMENCED PRODUCTION OF 5 MILLION TREE SEEDLINGS, LAYING THE GROUNDWORK FOR REFORESTATION AND URBAN GREENING CAMPAIGNS.
COMPLETED
585
DESIGNED AND IMPLEMENTED A TOOL FOR TRACKING EROSION SITES, LEVERAGING GIS TO MONITOR AND PRIORITIZE REMEDIATION OF OVER 150 GULLIES.
COMPLETED
586
DEVELOPED A DIGITAL REPORTING TOOL FOR WASTE DUMPS AND EROSION SITES, ENABLING CITIZENS TO GEO-TAG HAZARDS AND FEED REAL-TIME DATA INTO THE RESPONSE DASHBOARD.
COMPLETED
587
FACILITATED THE RETURN OF NATIONAL YOUTH SERVICE CORPS MEMBERS TO THE MINISTRY, BOOSTING FIELD SURVEY TEAMS AND COMMUNITY OUTREACH EFFORTS.
COMPLETED
588
FOUNDED NIGERIA’S FIRST-EVER CLIMATE CHANGE COMMUNITY DEVELOPMENT SERVICE (CDS) GROUP, MOBILIZING GRASSROOTS VOLUNTEERS FOR TREE-PLANTING, CLEAN-UPS AND CLIMATE EDUCATION
COMPLETED
589
DRAINAGE CLEARANCE OF MAJOR DRAINAGES WITHIN KANO METROPOLIS AND DISTRIBUTION OF DESILTING EQUIPMENT TO 60 SELF HELP GROUPS
COMPLETED
590
PRODUCTION AND DISTRIBUTION OF 3 MILLION SEEDLINGS AND MONITORING THEIR PLANTATION
COMPLETED
591
REHABILITATION OF 2NO. NURSERIES AT KAFIN CIRI GARKO LGA & MAI-NIKA GWARZO LGA AND TRAINING OF GARDENERS ON SUSTAINABLE SILVICULTURAL PRACTICES.
COMPLETED
592
LIVELIHOOD SUPPORT TO NEIGHBORING COMMUNITIES OF FALGORE GAME RESERVE (FALGORE, GADA BIYU AND YANTABARMI)
COMPLETED
593
IMPLEMENTATION OF COMMUNITY REVOLVING FUNDS TO 10 PILOT COMMUNITIES ACROSS KANO STATE
COMPLETED
594
RECLAMATION OF 374HA OF DEGRADED LAND IN PARTNERSHIP WITH FAO
COMPLETED
595
ESTABLISHMENT OF MORE THAN 1,000HA INDIVIDUAL/CONVENTIONAL ORCHARDS
COMPLETED
596
TRAINING OF FARMERS ON REGENERATIVE AGRICULTURE AND AGRO-FORESTRY
COMPLETED
597
RESTORATION OF OVER 20,533HA OF LAND THROUGH: ENRICHMENT PLANTING; CONSERVATION OF INDIGENOUS SPECIES; WOODLOTS; FOREST CONSERVATION, SHELTER BELT REHABILITATION
COMPLETED
598
PROVISION OF 68NO. SOLAR POWERED BOREHOLE IN WATER STRESSED COMMUNITIES ACCROSS KANO STATE.
COMPLETED
599
TRAINING AND SENSITIZATION OF STUDENTS ON CLIMATE CHANGE EDUCATION (ADAPTATION AND MITIGATION)
COMPLETED
600
PROCUREMENT OF 10NO. DUMP TRUCKS AND 2NO. PAYLOADER FOR REMASAB.
COMPLETED
601
PROVISION OF SOLAR POWERED SOIL/WATER LABORATORY TO NORTH WEST UNIVERSITY KANO
COMPLETED
602
ESTABLISHMENT OF 5NO. GREEN HOUSE TO ABCOA DANBATTA
COMPLETED
603
N8 BILLION NAIRA EROSION CONTROL PROJECT AT BULBULA/GAYAWA EROSION SITE.
ONGOING

Awards & Recognition

National and international recognition for outstanding governance and development initiatives

Good Governance Award
2023

Coalition of Civil Society Organizations (CSOs)

Recognized for transparent and people-oriented governance policies

Excellence in Education
2023

National Association of Nigerian Students (NANS)

For massive investment in education and student support programs

Infrastructural Development
2024

NUJ Correspondents' Chapel, Kano State

For urban renewal projects and road infrastructure development

Revolutionizing Agriculture
2024

Kano Agricultural Development Agency & Farmers Association

For agricultural reforms and support to local farmers

Grassroots Friendly Governor of the Year
2024

Arewa Youth Awareness Assembly

For policies directly benefiting common people at grassroots level

Security and Humanitarian Services
2024

Northern Nigeria Peace and Security Advocacy Group

For improving security and humanitarian interventions in the state

Blueprint Governor of the Year
2023

Blueprint Newspaper

Media recognition for impactful first-year performance

Daily Nigerian Governor of the Year
2023

Daily Nigerian Newspaper

Media award for bold policies and reforms in first 100 days

Excellence in Humanitarian Services & Youth Empowerment
2023

Human Rights Watch Africa

For social intervention programs and youth development initiatives